|
ChiCTR注册号: Reg No. in ChiCTR: |
ChiCTR2600117587 | ||||||||||||||||||||||
|
研究题目: |
A randomized controlled study of preoperative short-course radiotherapy + chemotherapy and immunotherapy combined with intestinal flora intervention for locally advanced middle and low rectal cancer |
||||||||||||||||||||||
|
Study title: |
A randomized controlled study of preoperative short-course radiotherapy + chemotherapy and immunotherapy combined with intestinal flora intervention for locally advanced middle and low rectal cancer |
||||||||||||||||||||||
|
注册状况: Registration: |
True |
||||||||||||||||||||||
|
注册机构: |
中国临床实验注册中心 |
||||||||||||||||||||||
|
Name of the Registry: |
Chinese Clinical Trial Registry |
||||||||||||||||||||||
|
项目负责人: |
中国临床实验注册中心 |
||||||||||||||||||||||
|
Corresponding person: |
Chinese Clinical Trial Registry |
||||||||||||||||||||||
|
电话: Telephone: |
+86 29 85324335 | ||||||||||||||||||||||
|
电子邮件 |
758327495@qq.com |
||||||||||||||||||||||
|
通讯地址: |
中国陕西西安雁塔西路277号 |
||||||||||||||||||||||
|
Address: |
No. 277 Yantai West Road, Xi'an, Shaanxi Province, China |
||||||||||||||||||||||
|
邮政编码 Postcode |
710000 |
||||||||||||||||||||||
|
项目负责人所有单位: |
西安交通大学第一附属医院 |
||||||||||||||||||||||
|
Institution: |
The First Affiliated Hospital of Xi'an Jiaotong Un |
||||||||||||||||||||||
|
批准本研究的伦理委员会名称: |
西安交通大学第一附属医院医学伦理委员会 |
||||||||||||||||||||||
|
Name of the ethic committee: |
Ethics Committee of the First Affiliated Hospital |
||||||||||||||||||||||
|
研究疾病: |
局部进展期(T3-4/N+)的pMMR/MMS型中低位直肠癌(磁共振肿瘤下缘距离肛门10厘米以内)患者 | ||||||||||||||||||||||
|
Study Ailment: |
Patients with locally advanced (T3-4/N+) pMMR/MMS type middle and low rectal cancer (the lower edge of the magnetic resonance tumor is within 10 cm from the anus) | ||||||||||||||||||||||
|
研究所处阶段: Study phase: |
|||||||||||||||||||||||
|
研究类型: Type of Study: |
Therapy Study | ||||||||||||||||||||||
|
研究团队: |
宋永春 |
||||||||||||||||||||||
|
Research team: |
Song Yongchun |
||||||||||||||||||||||
|
研究实施地点: Site of Study: |
|
||||||||||||||||||||||
|
预计起止时间: Planned Duration: |
2026/8/17 0:00:00-2026/8/17 0:00:00 | ||||||||||||||||||||||




