ChiCTR注册号: Reg No. in ChiCTR: |
ChiCTR1800017646 | ||||||||||||||||||||||
研究题目: |
A prospective,open-label, multicenter, randomized, Phase III trial to assess efficacy and safety of radical concurrent chemoradiotherapy alone versus radical concurrent chemoradiotherapy with consolidation chemotherapy for the locally advanced esophageal cancer. |
||||||||||||||||||||||
Study title: |
A prospective,open-label, multicenter, randomized, Phase III trial to assess efficacy and safety of radical concurrent chemoradiotherapy alone versus radical concurrent chemoradiotherapy with consolidation chemotherapy for the locally advanced esophageal cancer. |
||||||||||||||||||||||
注册状况: Registration: |
True |
||||||||||||||||||||||
注册机构: |
中国临床试验注册中心 |
||||||||||||||||||||||
Name of the Registry: |
Chinese Clinical trial registry |
||||||||||||||||||||||
项目负责人: |
中国临床试验注册中心 |
||||||||||||||||||||||
Corresponding person: |
Chinese Clinical trial registry |
||||||||||||||||||||||
电话: Telephone: |
+86 18639577032 | ||||||||||||||||||||||
电子邮件 |
fanchengcheng1985@163.com |
||||||||||||||||||||||
通讯地址: |
河南省郑州市东明路127号 |
||||||||||||||||||||||
Address: |
127 Dongming Road, Jinshui District, Zhenzhou, He'nan, China |
||||||||||||||||||||||
邮政编码 Postcode |
450001 |
||||||||||||||||||||||
项目负责人所有单位: |
郑州大学附属肿瘤医院 河南省肿瘤医院 |
||||||||||||||||||||||
Institution: |
Henan Cancer Hospital, Affiliated Cancer Hospital |
||||||||||||||||||||||
批准本研究的伦理委员会名称: |
河南省肿瘤医院医学伦理委员会 |
||||||||||||||||||||||
Name of the ethic committee: |
Medical Ethic Committee of the Henan Cancer Hospit |
||||||||||||||||||||||
研究疾病: |
|||||||||||||||||||||||
Study Ailment: |
|||||||||||||||||||||||
研究所处阶段: Study phase: |
Post-market | ||||||||||||||||||||||
研究类型: Type of Study: |
Diagnostic Accuracy Test | ||||||||||||||||||||||
研究团队: |
葛红,范诚诚,叶柯,郑晓丽,王浩,杨成梁,陆寓非,蒋月,张有改 |
||||||||||||||||||||||
Research team: |
Hong Ge, Chengcheng Fan, Ke Ye, Xiaoli Zheng, Hao Wang, Chengliang Yang, Yufei Lu, Yue Jiang, Yougai Zhang |
||||||||||||||||||||||
研究实施地点: Site of Study: |
|
||||||||||||||||||||||
预计起止时间: Planned Duration: |
2018/7/1 0:00:00-2024/11/1 0:00:00 |